Well, the roofing came in this week and we wanted to try to get it on before the snow fell, so #1 got her first lessons with drip edge...
You can see the full height of the place on the left side of the picture. That's an 8' green ladder below. On the other side of the house, it is only about 4.5 feet from the ground to the porch floor. That is where the "swinging" bridge will connect. The peak is about 12' from the porch deck.
While they were installing roofing, the building-permit guy came floating by...
Okay, not really, but we were totally surprised when this came over the back of our property. They were CLOOOOOOOOOOSE and so vividly beautiful.
This is the last piece of roofing going on for that side, and I had my camera set to night-shot because it was pretty dark. So, we're only half-done, but that's better than none-done.
All afternoon, while the construction was going on, I was doing "ultimate Fly-Lady". This is where you haul waste wood from the trees rows around your house and BURN them completely up, thus de-cluttering in the most intense way. It was very therapeutic. I was cleaning up the place, keeping warm and making sure Handyman didn't plummet off the side of his little obsession without supervision.